Commercial Standby Generators, Automatic Transfer Switches & Redundant UPS Systems

From crane-rigged multi-story generator plants at Harbor Place in Haverhill tohealthcare life-safety backup at The Bridges in Nashua, NH and corporate data center redundancy at Cumberland Farms HQ, Electrical Dynamics engineers and installs complete emergency standby generator and Uninterruptible Power Supply (UPS) systems under NEC Articles 700, 701, and 702.

Generator Capacity
20 kW to 2,000 kW+ (2 MW+)
Code Separation
NEC Art. 700, 701 & 702 Compliant
Transfer Switches
Open, Closed & Bypass-Isolation ATS
Testing Standard
NFPA 110 Level 1 / Level 2 Load Bank
CALL (978) 664-1050
Commercial Standby Generators, Automatic Transfer Switches & Redundant UPS Systems
Authentic EDI Installation MA #13881A • NH #56C

NEC Article 700 (Emergency), 701 (Legally Required) & 702 (Optional Standby) Separation

Massachusetts electrical inspectors (527 CMR 12.00) and municipal Fire Prevention bureaus strictly enforce physical raceway separation and selective coordination for emergency power systems. EDI designs and installs code-segregated multi-ATS architectures so life-safety egress lighting, fire pumps, and smoke control never share raceways or transfer switches with optional equipment loads.

  • NEC Article 700 Emergency Systems: 10-second maximum restoration for egress lighting, fire alarm, and life-safety systems in entirely independent metal raceways.
  • NEC Article 701 Legally Required Standby: 60-second restoration for laboratory fume hood exhaust, sewage ejector pumps, and stairwell pressurization.
  • NEC Article 702 Optional Standby: Closed-transition or delayed-transition ATS units feeding data centers, cold-storage refrigeration racks, and facility HVAC.
  • NEC 700.3(F) Permanent External Roll-Up Generator Docking Stations (Cam-Lok cabinets) for bypass-isolation maintenance.

Turnkey Rigging, Acoustic Enclosures, Remote Annunciators & NFPA 110 Commissioning

Our project teams coordinate concrete pad engineering, crane rigging, sub-base fuel tank leak-detection wiring, jacket-water block heaters, battery chargers, and NFPA 110 remote alarm annunciators at the building’s primary fire command center.

  • 3-Pole vs. 4-Pole switched-neutral ATS selection engineered to prevent ground-fault (GFPE) nuisance tripping on 480Y/277V services.
  • Centralized 3-phase online double-conversion UPS systems (30 kVA to 500 kVA+) with external maintenance bypass cabinets for server rooms and biotech labs.
  • Full resistive load-bank testing (2-hour and 4-hour NFPA 110 acceptance tests) with formal commissioning documentation.

NEC Emergency & Standby Power Classification Matrix (527 CMR 12.00)

NEC ArticleClassificationMax Transfer TimeRaceway & ATS Requirement
NEC Article 700Emergency Life Safety Systems≤ 10 SecondsDedicated ATS, independent raceways, selective coordination to 0.01 sec, external Cam-Lok docking station (700.3(F))
NEC Article 701Legally Required Standby≤ 60 SecondsDedicated ATS separated from optional loads; feeds lab fume exhaust, elevators & sump pumps
NEC Article 702Optional Standby PowerUser / BMS DefinedFeeds IT data rooms, process chillers, cold-storage racks & general business continuity
CSI Div 26 33 53Double-Conversion Online UPS0 ms (Zero Transfer)Seamless battery bridge during 10-second generator spin-up for servers & laser labs
NORTH READING HQ ENGINEERING DESK • CSI DIV 26 / 27 / 28 MA #13881A • NH #56C