Skip to Main Engineering Content
NORTH READING HQ • 72B CONCORD ST
Electrical Dynamics, Inc. (EDI) Logo
METROWEST I-90 MASS PIKE, ROUTE 9 & I-495 CORRIDOR

Natick, Framingham, Wellesley, Concord & Marlborough Commercial Electrical Contractors

MetroWest Massachusetts is home to some of New England’s largest corporate headquarters, software engineering campuses, and life-science manufacturing hubs. Electrical Dynamics has a multi-year track record of flagship project delivery across Route 9, the I-90 Mass Pike, and I-495—highlighted by The MathWorks Apple Hill West Campus (AH-1) and 139 kW Solar Array in Natick, Cumberland Farms’ 85,000 sq. ft. Corporate Headquarters in Framingham, Wellesley Country Club, and Trinity Episcopal Church in Concord.

MUNICIPALITIES SERVED: Natick, Framingham, Wellesley, Concord, Marlborough, Westborough, Southborough, Acton, Maynard, Hudson
ELECTRIC UTILITIES: Eversource Energy, National Grid (Marlborough/Westborough), Wellesley Municipal Light Plant (WMLP), Concord Municipal Light Plant (CMLP)
LOCAL AHJ & PERMITTING: Natick Community & Economic Development / Building Dept (13 East Central St) • Framingham Inspectional Services (150 Concord St) • Marlborough Building Dept (140 Main St)
DISPATCH MOBILIZATION SLA: 45–60 Minute Dispatch along I-95 / I-90 Mass Pike & I-495
Natick, Framingham, Wellesley, Concord & Marlborough Commercial Electrical Contractors

Flagship MetroWest Campus Execution: The MathWorks (Natick) & Cumberland Farms HQ (Framingham)

Multi-building corporate campuses require seamless integration between 480V primary power, standby generation, architectural lighting controls, and high-density structured cabling.

  • The MathWorks Apple Hill West (Natick): Multi-floor corporate electrical distribution, architectural lighting, NFPA 72 fire alarm, BICSI structured cabling, and a 139 kW rooftop solar PV array saving $22,252/year.
  • Cumberland Farms Corporate HQ (Framingham): Turnkey 85,000 sq. ft. headquarters electrical construction, MDF/IDF network infrastructure, and test-kitchen power.
  • Wellesley Country Club & Trinity Episcopal Church (Concord): High-finish hospitality and historic institutional electrical and life-safety upgrades.

Wellesley (WMLP) & Concord (CMLP) Municipal Light Plant + Eversource Coordination

MetroWest encompasses both Eversource / National Grid territories and independent municipal utilities in Wellesley (WMLP) and Concord (CMLP). EDI engineers service upgrades and commercial solar/EV interconnections tailored to each utility’s metering and rebate rules.

  • Preventive maintenance and annual NFPA 70B infrared thermography for Marlborough and Westborough biomanufacturing and distribution facilities.
  • Turnkey UL Fire Alarm testing and 24/7 emergency service across Route 9 and I-495.
NORTH READING HQ ENGINEERING DESK • CSI DIV 26 / 27 / 28 MA #13881A • NH #56C

Schedule a Walkthrough or Bid Proposal — METROWEST I-90 MASS PIKE, ROUTE 9 & I-495 CORRIDOR

Direct routing to Electrical Dynamics Estimating (info@electricaldynamics.com), 24/7 Service & Fire Alarm (service@electricaldynamics.com), or EDI Network Systems (telecom@electricaldynamics.com).

CALL (978) 664-1050