Case Study: Cumberland Farms 85,000 Sq. Ft. Corporate Headquarters & Enterprise Network
1. Engineering Challenge & Facility Requirements
Consolidating corporate operations for one of the Northeast’s largest retail and convenience chains into an 85,000-square-foot headquarters in Framingham required high-availability enterprise data center power, hundreds of structured cabling drops, executive lighting controls, and a full-scale commercial culinary test kitchen and retail mock-up center.
2. Electrical Dynamics Technical Execution
Electrical Dynamics and EDI Network Systems executed a coordinated multi-floor buildout—installing the building distribution panels, standby generator backup, commercial kitchen refrigeration and cooking lineups, energy-code-compliant lighting controls, and the entire Category 6/6A and fiber optic telecommunications backbone.
3. Verified Project Outcomes
- Delivered all 85,000 square feet of corporate office, data room, and culinary lab infrastructure under a single contract.
- Zero scope gaps between electrical power, kitchen hood shunt-trip life safety, and IT server room buildouts.
Jobsite Photo Documentation (1 Photos)